This requires road closures for everyone’s safety. Between 9.30am-3pm from 7 to 24 February fully signed daytime diversions will be in place on the B4499 from Brockton (B4386 Junction) to the Shrewbury district boundary.
We make every effort to allow you to access your property or business as easily and safely as possible. If you need assistance please speak to our on site operatives who will be able to assist.
The work is proposed to start between the 7th to 24th February 2023 with the road closure enforce between 9.30am-3.00pm Monday to Friday.
The works will involve taking down and rebuilding the left end of the upstream and downstream parapets.
Unfortunately in order to carry out the proposed work safely it will be necessary to close the bridge to vehicular traffic.
When the bridge is closed, traffic will be diverted along the B4499, B4387 & B4386 by a signed diversion route. For more information please visit https://one.network/?tmi=GB25235877